Back to home page
Versión española

About us Business Products and Services Contact News

ITD » Programmes

ITD takes part like partner share risk in the A380 programme.

  • HTP (Horizontal Tail)
  • S19.1
    • A380 HTP includes design, manufacturing, supply, logistic and MAP on the following systems:
      • ATA 92
      • ATA 28
      • ATA 27
      • ATA 85
    • S19.1 includes design, manufacturing, supply, logistic and MAP on the following systems:
      • APU EDUCTOR AIR INLET SYSTEM
      • APU EXHAUST SYSTEM
      • APU AIR INTAKE SYSTEM
      • APU DRAINAGE SYST
    • The design phase goes from Conceptual to Manufacturing and Installation drawing. The interface between our design and the rest of the structure and system, manufacturing, maintainability and stress are reviewed during this phase. The ITD responsible does not end with the first standard, ITD is responsible of control configuration, and included whatever change needs to optimize the design.
    • During manufacturing phase, ITD guarantees the right manufacture selection, and ITD is responsible to follow and control the production. All our manufactures are Airbus approval manufactures.

     © ITD. All rights reserved